Current Community Projects
Road Crew
- Filling potholes on Teepee, Shawnee, Tatamy, Shasta, Catawissa, Maxatawny, Conoquenissing.
- Cold patching throughout the community.
- Stormwater work with all this rain the past two weeks.
DPW Projects
- Uncovered all pools, pumps are up and running on Choctaw and Minisink. Island is being draining in preparation for major repairs.
- Bath House at Beach 4, main sewer drain repairs.
- Removal of unwanted decorations at Winter Wonderland as per Dana’s directions.
- Replacement of faded or damaged road signs throughout.
- Working on prepping the pool pump rooms for summer.
- Renting a street sweeper for a week to clean up parking lots and intersections.